Kiewit awarded construction contract for Memorial Stadium renovation

Kiewit winning is bad for NIL. This will finish at $900m
I'm not an expert in this industry, but I'd think some kind of cost caps/guarantees about Kiewit eating most/all of any overages would be worked into the deal to win a contract this size.

Our church had stuff like that built into the winning bid from a GC on a project that I believe was around 5-6 million.
 
I'm not an expert in this industry, but I'd think some kind of cost caps/guarantees about Kiewit eating most/all of any overages would be worked into the deal to win a contract this size.

Our church had stuff like that built into the winning bid from a GC on a project that I believe was around 5-6 million.

I know, I was mostly kidding. I'm actually a big fan of Kiewit
 
We knew about this back in August, I think @HuskerGarrett posted something about it in an EPP.

My wife works for Kiewit. They, along with every other construction company, have baked in incentives for early completion, under budget, etc...I'm sure the job will be done on time if not earlier and at or around the price quoted...at least that's what the public will see.
 
I have heard from someone at kiewit a while back that the lounge may be called the kiewit lounge or something similar. Which may be why they’ll eat some of the cost. He’s on the financial side of kiewit so I’ll see if he knows anything clearer about that.
Also know someone who signed a NDA for design of the stadium. I’ll try to pry from them!
 
We knew about this back in August, I think @HuskerGarrett posted something about it in an EPP.

My wife works for Kiewit. They, along with every other construction company, have baked in incentives for early completion, under budget, etc...I'm sure the job will be done on time if not earlier and at or around the price quoted...at least that's what the public will see.
Not a chance.
 
Renovating 100 year old stadiums isn’t a job for the low bidder low on experience
No way in hell was Hausmann getting that bid
It was known all along the engineering leader in Nebraska would get this bid
I’d honestly be afraid if they didn’t due to structural safety needing done to a 100 year old structure
 

Theme customization system

You can customize some areas of the forum theme from this menu.

  • Wide/Narrow view

    You can control a structure that you can use to use your theme wide or narrow.

    Grid view forum list

    You can control the layout of the forum list in a grid or ordinary listing style structure.

    Close sidebar

    You can get rid of the crowded view in the forum by closing the sidebar.

    Fixed sidebar

    You can make it more useful and easier to access by pinning the sidebar.

  • Color combinations cannot be used

    Color combinations are not available to you, this area may be restricted by administrators. Please contact the administrator for more information.

    Color gradient backgrounds
Back